How To Fit A Bathroom Sink Waste
Insert your new waste.
How to fit a bathroom sink waste. Install the basin taps. Hold a tape measure against the end of the waste pipe so 0 lines up with the inside wall of the pipe. Position the pedestal and place the sink basin on it. Apply firm pressure all around the top of the flange to seat it securely in its bed of putty.
If there s an overflow then make a note of the direction of the overflow cutout on your new waste. Put the flexible tap hoses on the tap tails. Then locate the threading on the bottom of the drain underneath the sink basin. Make sure they re equally positioned at 90 degrees to the inner rim of the bowl of the sink.
Step 2 use a spirit level to check that the basin and pedestal are level. How to fit a sink basin shower or bath waste pipe understanding waste pipe systems. Remove the old waste and clean up the old sealant. Insert the bottom of the drain into the open drain hole.
Position your sink in place and mark it out. Apply a bead of silicone sealant around the opening of the plug hole to create a watertight seal inside your basin. Set the new drain into place inside the sink basin. Disassemble your waste ready for fitting.
Measure the inner diameter of the waste pipe and drain. Fit the waste into the hole making sure any slots are pointed towards the overflow if your waste and basin has these. How to fit a bathroom sink. Secure the sink with fixings provided.
Sometimes you ll need a screwdriver to wedge in the top side of the waste to prevent it from spinning as you undo. It is a tough job to connect wastes to basins and sinks and this project helps you to understand waste systems and the potential problems you might have. Make sure the drain is perfectly flush with the bottom surface of the sink before you continue. Pull the tape measure horizontally across the pipe to the inside wall on the opposite side.
Turn off the water supply valves. Fit the waste outlet and waste trap and the bolt for the plug chain if needed. Put the pedestal into position in front of the water supply and waste pipes then place the basin on top making sure that is it sitting flush to the wall.